The limitations statement is the most-copied and least-written section in the discipline. Most reports carry a paragraph that could have been produced before anyone left the office, and that paragraph protects nobody: a reader cannot tell whether it describes this building or the template it came from.

A specific limitation does something a generic one cannot. It tells a later reader exactly which parts of the report rest on observation and which rest on inference, and it converts a gap in the work into a documented professional judgement. Clients notice the difference, and so do the people who read reports after something has gone wrong.

The example below records the real field conditions from the fictional Bellwether Commons visit — snow on part of the site, an inaccessible clubhouse roof, units requested and not made available, painted-over electrical labels — and shows what was done in response to each. That last part is what separates a limitation from an excuse.

Jurisdiction

Written primarily against US practice: the ASTM E2018 baseline, agency scopes such as Fannie Mae Form 4099, and — where a page says so explicitly — California statute. Client scope governs any individual engagement and may expand or reduce what is described here. State and local inspection obligations differ, and licensure requirements for the work described vary by state. Outside the US, treat the structure as transferable and the standards and statutes as not.

Limitations template

Free Word download, no email required. Or open it in Professional Drafter — it lands in your template library, ready to draft against.

When to use this document

  • Every property condition report. There is no assessment without limitations; a report that claims none is describing the standard of care it failed to meet.
  • Whenever a client scope, weather, access, occupancy or concealment prevented an observation you would otherwise have made.
  • As a live document during the site visit rather than a section written at the end, because the details that make it useful are the ones nobody remembers a week later.

Worked example

Fictional. Field limitations recorded during the Bellwether Commons site visit — 132 units, eleven buildings plus a clubhouse, Columbus, Ohio, 4 March 2026 — a day with three inches of snow remaining on the northern half of the site from a storm two days earlier.

Scope Limitations

Unit observation was by sample rather than full survey, at a target of 15 of 132 units, agreed in writing with Northbank Capital on 20 February 2026. That target was set against the tiered minimum in Fannie Mae Form 4099 for a property of 51 to 300 units — 10 percent of all units, which is fourteen here, with every unit vacant longer than 90 days and every down unit additional to that count. This engagement is not a Fannie Mae loan and Form 4099 does not bind it; the four down units reported by management were counted within the fifteen rather than in addition to them, which is the one respect in which the sample is smaller than that scope would produce, and it is recorded here for that reason. No specialist consultants were engaged; roofing, mechanical, electrical and structural observations are those of a generalist assessor, and where a specialist evaluation is warranted this report recommends one rather than substituting an opinion for it. No invasive or destructive testing was performed, no materials were sampled, and no calculations of structural capacity were made. No environmental assessment of any kind is included, and nothing in this report should be read as one. Accessibility observations are visual and non-specialist, and constitute neither a compliance survey nor a certification.

Access Limitations

Clubhouse low-slope roof: not accessed. No ladder of adequate length is kept on site, the maintenance manager confirmed none was available on the day, and there is no interior roof hatch. Approximately one third of the roof area was observed from the second-storey east window of building 1, from which the field membrane appeared intact with no ponding visible in the area seen. The remaining two thirds were not observed by any means. The reserve schedule carries this roof at full replacement in year four rather than at recoating as a result; observation of the full area by lift or drone would settle it and could reduce the reserve figure by approximately $43,000.

Residential roofs: all eleven were observed from ground level and from a ladder placed at the eave. None was walked. The pitch is approximately 4:12 and the shingles are brittle and cupping, so walking them would have risked damage to the roof and to the assessor. Valleys and flashings at buildings 3 and 7 were observed from the ladder at close range; field areas at the ridges of all buildings were observed from the ground with binoculars.

Units: 15 units were requested for observation and 15 were made available, but not the 15 requested. The rent roll was provided on the morning of the visit rather than in advance, so selection could not be prepared beforehand; units were selected on site with the property manager, distributed across unit type, building and floor as far as the list allowed, but not by a random draw prepared in advance. Management reported four units down for turnover and no others; all four were made available, were observed, and are included in the count. Two units originally selected were not entered — one because the resident declined access at the door, one because a dog was loose in the unit — and two alternates of the same type in the same buildings were substituted. All residents had been notified of the inspection by management.

Mechanical spaces: all four mechanical rooms were opened by the maintenance manager and observed. The electrical service equipment room at building 6 was observed; the meter bank enclosures were not opened, as opening them is utility work.

Weather and Site Conditions

Approximately three inches of snow remained on the northern half of the site at the time of the visit, from a storm on 2 March 2026. The following were not observable as a result: the northern parking area and its striping, approximately 40 percent of the site's asphalt surface; the walkways serving buildings 9 through 11; and the landscaped areas and site drainage north of the clubhouse. Drive aisles had been ploughed and were observed. Roofs were observable, as the pitched shingle roofs had shed the snow and the areas of the clubhouse roof seen from building 1 were clear. Aerial and street-level imagery of the property was reviewed before the visit and again afterwards; the most recent aerial available is dated April 2025, and the paving condition it shows is consistent with what was observed on the ploughed drive aisles. The maintenance manager was interviewed specifically about the snow-covered areas: he reported that the northern parking area was included in the circa 2011 overlay, that it has not been sealed or striped since, and that no drainage complaints have arisen there. The paving quantity in the reserve schedule is therefore based on the measured site area and the observed condition of comparable ploughed surfaces, and carries the northern area at the same treatment as the areas observed. If the northern surface is materially worse than the areas seen, that line is understated.

Document Limitations

Requested from the client on 20 February 2026 and not provided: days-vacant report, move-out report, roof and mechanical warranties, open building department permits, and any prior condition report. The rent roll was requested for delivery in advance and was provided on the morning of the visit. The consequence is specific rather than administrative: without days-vacant and move-out reports, unit selection could not be weighted toward long-vacant units, which are where deferred condition typically concentrates. The sample is therefore weighted toward occupied units and the four down units offered by management. Without warranties, no roof or equipment is credited with remaining warranty coverage anywhere in this report. Without building department records, no statement is made about open permits or unpermitted work, and none should be inferred. The property manager reported that a condition report was prepared for the current owner's 2019 acquisition but could not locate it; nothing in this report relies on it.

Concealed and Inaccessible Conditions

This assessment is a visual, non-invasive walk-through. Structural framing, insulation within closed assemblies, below-grade utilities, the interiors of mechanical and electrical equipment, and any component concealed by finishes, stored goods or landscaping were not observed. No finishes were removed, no equipment was dismantled, and no excavation was performed. Where loose or already-detached trim permitted observation of concealed framing without removing anything — as at the exterior stair stringers — that observation is identified as such in the body of the report, and its extent is stated. Conditions may exist that a visual assessment of this kind cannot detect, and their absence from this report is not evidence of their absence from the property.

Effect on Conclusions

Three limitations materially affect conclusions in this report, and each is resolved in the conservative direction. First, the unobserved clubhouse roof: carried at full replacement in year four rather than recoating in year eight, a difference of approximately $43,000 in the reserve schedule. Full observation would settle it. Second, the painted-over electrical panel labels: no panel replacement is carried on either schedule, and the immediate repairs schedule declines to price the exposure at all, because the panel type — and therefore the work — is unknown. That is the honest treatment and it is deliberately not converted into a range here: a number attached to an unidentified panel would be invented, and a reader would carry it forward as though it had been derived. An electrician's identification across a sample of buildings would settle the question at nominal cost, and only then can it be priced. Third, the snow-covered northern parking area: carried at the same treatment as the observed areas, which is the less conservative of the available choices and is identified here for that reason. A return visit after the thaw would settle it, and given the size of the paving line — $401,200 — that visit is worth the client's consideration before closing.

Section-by-section guide

What each section is for, what a good one contains, and where they typically go wrong.

1.Scope Limitations

Limits agreed in advance: sampling rather than full survey, systems excluded, specialists not engaged, no testing. These are decisions, not failures, and identifying who agreed them is what makes that clear.

2.Access Limitations

Anything that could not be reached: roofs without ladder access, locked mechanical rooms, crawl spaces, units not made available. Record what was requested, what was made available, what was not, and what you did instead — the alternative you attempted is the professional judgement. On a Fannie Mae loan the expectation goes one step further than documentation: the May 2024 PCA FAQ (Q10) said an inaccessible flat roof should be identified roof by roof and should result in a more conservative Replacement Reserve estimate, and the same logic is applied to units at Q7. An access limitation that leaves every number unchanged has not been taken seriously.

3.Weather and Site Conditions

Snow, standing water, darkness, active construction. Name the specific elements the condition made unobservable, rather than noting the weather in general — 'snow cover' is context, while 'snow cover prevented observation of the roofs at buildings 1 through 4, the northern parking area and all walkways east of building 6' is a limitation. Fannie Mae's May 2024 PCA FAQ set out the whole sequence at Q9: name snow as a field limitation, list the specific items left unobservable, review online aerial and street-level imagery before the site visit and establish whether it is current, then interview management about the snow-covered areas — their maintenance schedule, their age, and any capital work done since the imagery was taken.

4.Document Limitations

Documents requested and not provided, and what could not be established as a result. A missing rent roll is not merely an administrative inconvenience: it changes how units could be selected for observation, and that consequence belongs here. It is also reportable in its own right on a Fannie Mae loan — the May 2024 PCA FAQ (Q6) said a rent roll requested in advance and not provided before the site visit must be documented in the report as requested and not provided.

5.Concealed and Inaccessible Conditions

The standing limitation that applies to every building — framing, below-grade utilities, insulation in closed assemblies, the interiors of equipment. Keep it short and keep it separate from the specific limitations above, so the two are not read as equivalent.

6.Effect on Conclusions

The section almost nobody writes, and the one that makes the rest worth reading: which conclusions in the report would change if a limitation were removed. Where a limitation caused you to be conservative, say so and say by how much.

Common mistakes

The failure modes that show up most often when this document is reviewed later.

A limitations paragraph that could have been written before the visit.

Boilerplate cannot tell a reader which parts of this report rest on observation. Name the roof, the units, the weather and the documents; the specificity is the entire value.

Noting the weather instead of the consequence.

'Snow was present on site' is context. The limitation is which items could not be observed because of it — and Fannie Mae's May 2024 PCA FAQ expected exactly that at Q9: snow named as a field limitation, with the specific items left unobservable identified, imagery reviewed and dated before the visit, and management interviewed about what the snow is covering.

Documenting an inaccessible roof and then changing nothing.

Fannie Mae's May 2024 PCA FAQ (Q10) expected a lack of roof access to result in a more conservative Replacement Reserve estimate, and applies the same expectation to units at Q7. A limitation that moves no figure is a paragraph, not a judgement — and it leaves the reader carrying a risk the report has noticed and priced as though it did not exist.

Recording an access failure without recording the alternative you tried.

A roof that could not be walked but was observed from an adjacent window, with management interviewed about the rest, is a professional response. The same roof recorded as 'not accessed' looks like a shortcut.

Leaving out the effect on conclusions.

A limitation with no stated consequence is a disclaimer. A limitation that says which figure it moved, in which direction, and what would resolve it is information the client can act on — sometimes by paying for the observation you could not make.

Silently resolving an unobserved item in the cheaper direction.

It is the one direction that has to be explained later. Where you take the less conservative path — as with a snow-covered parking area — say so on the page, so nobody discovers it after closing.

Questions

How specific do limitations need to be?
Specific enough that a reader can tell what was and was not observed at this property. Name the building, the roof, the units, the documents. Fannie Mae's PCA FAQ, dated 1 May 2024, illustrates the standard at Q9: it expects snow to be named as a field limitation with the specific items — roofs, roadways, parking areas — that were unobservable identified.
Is drone or aerial imagery an acceptable substitute for roof access?
Fannie Mae's FAQ answers the drone question in four words at Q11 — yes, but not required. It is more demanding one question earlier: Q10 says the maintenance staff should have access to all building systems including roofs, that a report must identify which roofs were visible and which were not, and that a lack of roof access should result in a more conservative Replacement Reserve estimate. Aerial and street-level imagery is a useful check but is dated; if you rely on it, give its date and say what you did to establish whether it is still current.
What if property staff will not open something?
Record what was requested, what was refused or unavailable, and by whom. Fannie Mae's guidance on units is the model. Q7 covers residents not notified of the inspection: document the lack of cooperation by the manager or owner, identify which specific units were requested and unavailable, and consider whether the shortfall justifies a more conservative Replacement Reserve estimate. Q8 covers down units: refer to the current rent roll, days-vacant report and move-out report when choosing vacant units, interview the maintenance manager, and state the number of down units management reported — or that none were identified.
The owner completed a repair after the site visit. Can it come off the schedule?
Not by the consultant's hand alone. Fannie Mae's May 2024 PCA FAQ was direct at Q12: the report reflects the property's condition at the time of the site visit. If the consultant reinspects and confirms the work, the report can be updated; if not, the decision to exclude the item from the escrow sits with the lender on the strength of invoices and confirmation of payment, and it is a change to the loan documents rather than to the cost schedules in the report. The same principle runs the other way in the FAQ's opening question, under its Planned Capital Expenditures heading: a borrower's planned capital expenditure does not come off the schedules either, because the schedules are dated to the inspection and not to anyone's intentions.
Does a long limitations section make the report look weak?
The opposite, in the eyes of the people who read reports professionally. A report with no limitations is either a much larger engagement than the fee suggests, or an incomplete account of the day.

The blank template

Exactly what is in the Word download, so you can see the structure before deciding whether you want it.

Scope Limitations

[Each scope limitation agreed with the client, and who agreed it.]

Access Limitations

[Each area not accessed, why, what alternative observation was made, and the effect on the report.]
  • Roofs — state the observation method used for each, or that none was possible, and whether the reserve estimate was made more conservative as a result
  • Units — number requested, number made available, how the shortfall was handled, the minimum the client scope sets where it sets one, and whether the client was notified when that minimum was not met
  • Down units — the number management reported, or that none were identified
  • Mechanical, electrical and service spaces
  • Any area the property staff could not open

Weather and Site Conditions

[Weather or site conditions during the visit, the specific items left unobservable, and any substitute observation used.]

Document Limitations

[Documents requested and not received, when they were requested, and what could not be determined without them.]

Concealed and Inaccessible Conditions

[Standing statement of concealed conditions not observed, and that no invasive or destructive investigation was performed.]

Effect on Conclusions

[For each material limitation: what conclusion it affects, in which direction, and what would resolve it.]

Download this template

Free Word download, no email required. Or open it in Professional Drafter — it lands in your template library, ready to draft against.

Sources

Related templates

This page is a documentation aid — not engineering advice, not legal advice, and not a substitute for the standard or client scope your engagement runs under. A template cannot tell you what your assessment requires. The worked example describes a fictional property, and its costs, quantities and service lives are illustrative only.